Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2014 – till now |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Project Features | Liquid nitrogen supplies to Karachaganak field at the request of the client.
Deliveries over the past five years: 2019: 2 524 t; 2020: 742 t; 2021: 891 t; 2022: 881 t; 2023: 1 413 t. |
Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2015 – 2022 |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Service | Leak test services using nitrogen-helium mixture (N2-He), purging and equalizing. |
Project Features
|
Year-round provision of one set of equipment and personnel for purging, nitrogen-helium testing, nitrogen pigging at all field facilities (KPС, UNIT-2, UNIT-3, KOTS, Gathering department).
During 2019 Shutdown (Turnaround) the following was involved: · 304 employees, 100% made up of local staff; · more than 120 pieces of equipment of various types; · 58 units of cryogenic tanks with a total capacity of more than 700 tons of liquid nitrogen; · 17 units of helium gas vessels with a total capacity of more than 7800 m3; · 17 units of high-pressure nitrogen plants up to 700 bar/ 5000 m3/h; · 8 units of low pressure LN2 vaporizers 16 bar / 500 m3/h; · 17 units of high-tech leak detection devices. |
Operator | Tengizchevroil (TCO) |
Period | 2019 |
Location | Kazakhstan, Atyrau region, Zhylyoiskiy district
Tengiz oil and gas field. |
Project | Future expansion project /
Wellhead pressure management project. |
Service | Execution of nitrogen filling works. |
Project Features
|
Nitrogen preservation of the multiphase carbon steel pipeline at site 51. |
Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2020 – 2021 |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Project | KPO Project of the 4th Gas Compressor. |
Service | Pre-commissioning complex of jobs – hydrostatic tests, chemical cleaning, hot oil flushing, N2/He leak testing, nitrogen preservation of pipelines and vessels. |
Project Features
|
The latest equipment was mobilized to carry out the complex of works, such as the FS4000 oil flushing unit, particle counter MP Filtri, Hydra Rig 180K nitrogen converter, Masspectrometer UL300 leak detection devices and the portable HD-1 device. |
Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2021 – till now |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Service | Provision of services for technological tightening of bolted connections, tensioning and flange machining. |
Project Features
|
To perform the work during the Shutdown in 2022, RT Alliance LLP provided personnel certified according to international standards ASME and ECITB. Over 1,100 bolt tightening specialists and machining specialists were involved at the same time within a month. |
Operator | North Caspian Operating Company N. V. (NCOC) |
Period | 2022 |
Location | Kazakhstan, Atyrau region
«Bolashak» Onshore Complex. |
Project | Repair of Slug Catcher. |
Service | Composite wrapping and cold cutting services. |
Project Features
|
Providing services for cold cutting of pipes with a diameter of 42” and composite wrapping over 350 meters of pipeline with a diameter from 24” to 42”.
To carry out the work, RT Alliance LLP mobilized 240 personnel within the shortest time. |
Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2023 |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Project | Modification at KPC Plant for future KEP-1 connections. |
Service | Performing work on creating an ice plug using liquid nitrogen on a pipeline with a diameter of 24 inches. |
Project Features
|
The main task was to create an ice plug at the 24” outlet of the existing pipeline at tie-in point 50-254-005 to connect a new pipeline.
During freezing, a 24-inch diameter blind flange was dismantled for 62 hours and a new spool was installed to connect the 2020-WF-501-24 line. |
Operator | Karachaganak Petroleum Operating B.V. (KPO) |
Period | 2022 – till now |
Location | Kazakhstan, Aksai
Karachaganak oil and gas condensate field. |
Service | Provision of composite pipeline wrapping services. |
Project Features
|
Provision of composite material wrapping services for pipelines and other pressurized equipment.
Repair of thin-walled pipes, as well as elimination of leaks and other corrosion defects present on the equipment of the field collection system and on oil refining equipment made of various materials. The most common of these are carbon steels, alloy steels, or stainless steels. The design temperature range is from – 45 to 260o C, and the design pressure is from 0-100 Bar. The working medium is sweet or high-sulfur gas, condensate, amine, glycol, methanol, water, steam, sulfuric acid, alkali, liquefied petroleum gas (LPG), steam or water. |