December, 2019. Mangistau region. Carried out work on the bolted joints with hydraulic wrenches with a controlled torque value.

 

Scope of the work is to tighten the joints of metal structures evenly and with a fixed torque,to ensure the reliability of the installation of containers on the offshore platform further.Involved 2 specialists of the RT Alliance staff and set of hydraulic torque equipment Torsion-X.Along the perimeter of five containers our specialists tightened more than a thousand joints.